Bluewater Wind Energy Centre

BW_T3

Bluewater Wind Energy Centre

Development on the Bluewater Wind Energy Centre began in 2006. This project, located within the Bluewater Township, with electrical interconnection extending into Huron East, has a maximum generating capacity of up to 60 megawatts, enough energy for approximately 15,000 homes in Ontario. The project is owned by Cordelio Power and Axium Infrastructure (51% and 49% respectively) and their subsidiaries; it is operated by NextEra Energy Canadian Operating Services, Inc.

Location:Bluewater Township, Ontario
Number of Turbines:37
Turbine Technology:GE 1.6-100 Series
Project Capacity:60 MW
Commercial Operation:July 2014

Contact Information: For more information, please send inquiries to info@cordeliopower.com or call 647-352-9533.


Construction Report
Decommissioning Report
Project Description Report
Turbine Visualization Images
Wind Turbine Specification Report